Home | Site Map | Contact Us
Our Profile QMS Vision Mission Values Our Associates Product Line
1
1 1
1
1
1
1
1
1
1
1
ACHIEVEMENTS

March , 2014

AFEI Largely participated in 4th Extension of Tarbella Dam providing hundreds of meters Cable trays, GI Pipe & Channels.

Febuary, 2014

AFEI  has won the contract of 65 underground fuel storage tanks of 15000 & 25000 litres capacity for Pakistan State Oil(PSO). 

January, 2014

AFEI is assisting IBA Sukkhur project by supplying miscellaneous items. A project of DESCON Engineering.

AFEI is supplying steel structure at DTI Project Lahore. A project of DESCON Engineering.

AFEI has been chosen to execute the FWELLI I Wind project at Gharo due to our prime quality of services. A project of DESCON Engineering.

AFEI has provided fabrication, supply and installation of cable support system at UNI Lever Walls Plant Lahore.

Read More

December, 2013

AFEI is potential supplier of steel structure 425 MW Combined Cycle Power Plant at Nandipur.

Read More

November , 2013

AFEI has successfully completed the FWELL II Wind project at Gharo. A project of DESCON Engineering. Complete cable support system including hanger posts has been provided by AFEI

Read More

September, 2013

Ashraf Industries is supplying bulk amount of steel material for DG Cement Kalar Kahar.

Ashraf Industries is continuous supplier of cable trays for NISHAT MILLS.

Read More

August, 2013

Complete installation of Lightning Earthing Protection System for Jinnah Bairaj is provided by Ashraf Industries. A project of DESCON Engineering.

Read More

July, 2013

Ashraf Fabrication & Engineering Industries is continuous supplier of grating & Steel structure at Engro EXIMP Muridakay. Ashraf Industries has largely participated in installation of steam turbine at Engro Muridkay.

Read More

April, 2013

Ashraf Industries approved as a Sole Supplier of cable tray/ cable trunking (cable support system) to whole BBIA(benazir Bhutto international airport) Islamabad Project.

Read More

September, 2012

Design, Fabrication & Supply of Trash Rack Panels & Fish Beams of 450Tons Weight within 30Days of Time Period to Laraib Energy Limited for New Bong Escape hydro Power Plant that is first IPP in Pakistan.

Read More

September, 2012
Design, Fabrication & Supply of 30MTon LPG Bowzers to Madni Gas (IRIS Corporation).

Read More

September, 2012

Design, Fabrication & Supply of 12 Nos of 500BBI Crude Oil Storage Tank for Mari Gas Company Limited. these are rectangular shape storage tanks design & fabricated on API 650.

Read More

August, 2012

Design, Fabrication & Supply of GI Cable Tray & Trunking to Siemens Pakistan for BBIA project Islamabad. PMC, CAA & NESPAK approved our cable tray for this project.

Read More

May, 2012

We are approved supplier of GI cable from NESPAK.

Read More

March, 2012

Ashraf Industries is a continues sup[plier of Hot Dipped Galvanized Rock Bolts & Wire Mesh to Neelum Jehlum Project & supply thousands of tons of Hot Dipped Galvanized Rock Bolts & Wire Mesh since last two years.

Read More



Certificates & Approvals
 
ASHRAF INDUSTRIES is well equipped manufacturing set-up with all necessary cutting / shearing, forming, welding, machining, handling and surface treatment facilities. A complete list of installed Machinery and Equipment can be provided upon request.

Our human resources are enough to take any big challenges, and are compatible with the best in the field. Ashraf Industries is proud of its qualified and experienced management team assisted by well experienced Engineers / Supervisors and supported by highly skilled technicians.

The organization has a strong management and control system in place, which ensures quality services provided on schedule. The set up is ISO 9001-2008 certified.
 
 
1          
 
Copyright © 2012 | Privacy Policy | Terms & Conditions   Powered by   Grafix 360